Awarded 7/9/2024 to Randal Ponce dba PECC.
NOTICE IS HEREBY GIVEN that the PORT OF BREMERTON is hereby seeking proposals for public works contract work for the construction of renovating the exterior of the BACE building and roof.
SCOPE AND NATURE OF WORK: Construction consists of exterior remodel work at 8820 SW State Hwy 3.
PROPOSAL SUBMITTAL INFORMATION AND SITE VISIT: Submit proposals by 2:00 pm – Tuesday, June 25th, 2024 to: Port of Bremerton, James Goodman, 8850 SW State Hwy 3, Bremerton, Washington 98312. Electronic proposals as accepted via e-mail to: jamesg@portofbremerton.org with cc to ellena@portofbremerton.org. Request a delivery and read receipt on electronically submitted proposals. Bid prices will be publicly read following the proposal submission deadline at Airport Conference Room, 8850 SW State Hwy 3, Bremerton, WA 98312.
For a site visit call James "Goody" Goodman, 360-813-0817 or e-mail jamesg@portofbremerton.org. SITE VISIT APPOINTMENTS AVAILABLE ON June 12th between 1:30-3:00 PM
CONTRACT ISSUES: This work is considered a public work contract under RCW Chapter 39. The successful contractor will be required to execute a short form contract with the Port. Among other requirements, Port public works contracts are subject to the following:
- Prevailing Wage Provision: The workers of all contractors and subcontractors on all Port "public works" as defined by RCW 39.04.010, shall be paid the "prevailing rate of wage" including "usual benefits" and overtime, paid in the locality as those terms are defined by Chapter 39.12 RCW. The contractor is responsible for obtaining and completing all required government forms and submitting same to the proper authorities. In accordance with RCW 39.12.030, applicable prevailing wage rates can be found online at http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp.
- Retainage: By state law, the Port is required to retain five percent (5%) of the total contract amount for 30 days after final acceptance or until required state certificates of release are provided to the Port, whichever date is later.
- Bond Requirements: The entity submitting the successful proposal will be required to deliver to the Port prior to contract signing a satisfactory performance bond in an amount equal to one hundred percent (100%) of the contract price. On contracts of one hundred fifty thousand dollars ($150,000) or less, the contractor may, in lieu of the bond, allow the Port to retain ten percent (10%) of the contract amount for up to 30 days following the date of final acceptance or until the retainage mentioned in B. above can be released as provided by law, whichever date is later.
- Insurance. Contractor agrees to obtain at its own cost and expense, public liability insurance with combined bodily injury and property damage limits in the amount of $1,000,000 in a form satisfactory to the Port of Bremerton, naming the Port as an additional insured. Such insurance shall not be diminished or rescinded without first giving the Port thirty (30) days written notice.
Download the Request for Proposal package in link above.